SHED BUILDING VIDEO 10 OF 15
How to Install Roof Sheathing on a Shed
Learn how to install roof sheathing on any project with our step-by-step guide & videos. Discover tips for safety, tools, h-Clips, panel alignment and cutting.
Taught by Henry Reinders, a professional builder, renovator and woodworker with more than 45 years of hands-on experience.
Popular Video Chapters
Select a topic to jump directly to that part of the video.
0:05 Add temporary blocking at the sub-fascia
Add temporary blocks along the sub-fascia to support the first roof panel while you position it.
0:57 Measure and cut the first roof panels
Measure the roof from the gable edge to a truss centre, then cut the first sheathing panels accurately.
2:02 Position and fasten the first sheet
Henry shows how to position the first sheet with a small edge allowance and fasten it into each truss.
3:10 Choose between plywood and OSB
Compare exterior plywood and OSB, including surface orientation and the material requirements for your roof.
3:46 Add a temporary roof-safety cleat
Install a temporary cleat for safer footing while following appropriate fall-protection practices.
5:14 Install the lower sheathing row
Fit the lower row with expansion gaps and fastener spacing suited to the sheathing, framing and local requirements.
6:22 Stagger the upper panels for strength
Stagger the upper-row joints so they do not align with the lower sheathing seams.
7:49 Install H-clips and finish the ridge
Henry explains how H-clips support panel edges and how ridge-vent plans affect the sheathing gap at the peak.
WANT TO BUILD THIS SHED?
Complete Plans When You’re Ready
Use the video tutorials to help build the shed. Use the plans for exact dimensions, drawings, material lists, construction sequence and the included Excel costing sheet.
Shed Roof-Sheathing Quick Reference
Sheathing choices affect how the shingles perform later, not just how solid the deck feels underfoot now.
Key specs at a glance
- Material shown: 1/2-inch exterior-grade plywood or OSB; required thickness depends on framing spacing (1/2″ on 24″ centers is usually within code), roof loads and local requirements.
- H-clips: support panel edges between trusses and reduce flex
- Joint pattern: stagger joints row to row as shown in plans
- Overhang: sheathing should not overhang the sub-fascia and interfere with finish trim
- Footing: temporary cleats keep sheathing from sliding off roof until secured
Common mistakes to avoid
- Letting sheathing overhang the sub-fascia so the finished fascia won’t sit flat
- Skipping H-clips between trusses, which lets panels flex and shingles crack over time – or immediately if stepped on
- Lining up joints in a straight run instead of staggering them
- Starting the sheathing without temporary cleats
- Using interior-grade panels instead of exterior-rated sheathing
PROJECT RESOURCES
Need a Budget? Price the Project Before You Build
Download the free Excel costing sheet to enter current local prices, provided for both shed plan sizes and both old and recent Excel formats (just in case you need the older file format).
Frequently Asked Questions
Questions are based on the topics covered in this video and common questions Henry receives from customers via email.
Can plywood or OSB be used for roof sheathing?
Yes. The video discusses both, but the material must be exterior-grade and suitable for the roof design. Typically, 1/2-inch-thick material is the better option, especially with asphalt shingles. Watch at 3:10
What do H-clips do?
They support adjoining panel edges between trusses, maintain spacing and reduce flex that could affect the roofing and otherwise cause broken shingles when stepped on. Watch at 7:49
Why stagger roof-sheathing joints?
Staggering prevents a continuous weak joint and produces a stronger roof deck with less flex. Watch at 6:22
Should roof sheathing overhang past the sub-fascia?
No. An overhang can prevent the finished fascia from sitting flat against the sub-fascia (end rafter). Watch at 7:49
What are the temporary roof cleats for?
They provide more secure footing while installing panels higher on the sloped roof. Watch at 3:46
Complete Video Transcript
Use the expandable transcript to read Henry’s instructions found in this video – with timestamps linked to each section in the video.
Open the complete video transcript
Welcome to CountryLifeProjects.com. I’m Henry Rinders. This is video 10 of 15 videos in our shed project. In this video, I’m going to be showing you how to do the roof sheathing. There’s a few things you need to know, a few specifications. So, let’s get started on that. Now, in this video, we’re going to show you how to do the sheathing on the roof of your shed. There’s a few things that are important uh to get started. Just want to point out that we put blocking on our subfasia to support our panel when we put it up here. Makes it very easy, especially if you’re working on your own. I also have one on the very end over here so that I can
just slide my plywood over, butt it up against there. And then just pull it back a little bit just to make sure we’re not hanging over the edge. And on here is our joint. So we’re going to put it. So we also have blocking for the next sheet. The measurement I’m going to be doing first is just under 80 and a quarter. That’s allowing for the end here to come in a 16th of an inch. I’m going to go cut that now. We’ll be right back. Show you how to place that. Okay, we have our sheathing in place. You’ll notice that the blocks hold it nicely at the bottom. It is flush across the bottom here. And I put a screw in it just so that I can show you a couple
things. It’s halfway on the truss over there. And over here, what’s important to look for. So, you want to be a sixteenth of an inch back here. And you want this even all the way up. If for some reason the end gable here on the ladder is either in or out, then that means that your end wall and your gable end of your shed is probably not level, and you’ll need to make some adjustments to either bring it this way or that way. Right now, we’re good. So, we’re just going to finish screwing this panel off, and then we’re going to go over and do the next panel over there.
Once we’re done with that, we’re going to do the top pieces. And we’re going to be using H clips on those. Those are important. When we get there, I’ll show you why. One more thing, just as I showed you on the floor, I don’t know if you can see it on the film, but if you can, there’s lines from the rollers in the mill. Typically speaking, these are parallel with the end of the panel. So, you can actually use these as a guide when you’re screwing into your trusses. The other thing I want to talk about is if you’re using OSB, 1/2 in OSB on your roof, there’s a smooth side and there’s a
there’s a kind of a rough side to OSB. When you’re using OSB, put the rough side out. It does give you some extra traction when you’re walking on the roof. Also, on the reverse side of this plywood, we have a marking for labeling it as an exterior sheathing. It’s probably best to put it down if you’re having your shed inspected or if you were doing this on a house. That way, the inspector can actually see the label. He knows it’s exterior plywood because if the roof’s on here, you won’t be able to see that. That’s the only reason for that label on this sheathing. If you’re not going to be inspected or if you’re not having your shed inspected, then don’t worry about
it. You can put the label up or down. It doesn’t matter if you’re using plywood. But again, OSB, put the rough side up. Other than that, that’s about it for uh those few tips. Okay, got this piece cut. You lay it up here. Make sure you got about a 16th of an inch space between this and the next panel. That’s just for expansion and contraction. We’re about a sixteenth of an inch in on the end here. What I didn’t mention in the previous section is the spacing for the screws. About every 8 in across the bottom, every 8 in up. I’m going to screw this sheet off. I’m just going to show you a little safety thing you
should do before you climb on the roof. I’m only screwing as far as I can reach safely. It’s a good idea, too, when you’re screwing along edges to pair them up, not have them randomly spaced. Also, when you’re laying these in place, make sure the plywood isn’t sticking past here on the subfacia. That’ll interfere with your finished facia board. Okay, I’ve screwed off what I can reach. Now, what I like to do before I climb climb on the roof is put a 2×4 cleat along the bottom. Make sure you’re near a uh truss just for right on the center. We can screw it in there. You want to screw through into solid 2×4. Putting it right at the bottom is a good bet.
Make sure you’re using 3-in screws and one every 16 in to 2 ft should be sufficient. Remember, this is just a safety feature. Now that that’s on there, can safely climb up here. And if I was to slip, I got that to grab onto. So, the next thing we’re going to do is we’re going to rip our pieces for the top here. Just measure straight down from the peak minus an eighth of an inch. We’re going to have an eigh inch space here. That’s important. The H clips that we’re going to put on here, which I’ll show you later, automatically provide the correct spacing, so you won’t have to worry
about sizing that up. So, I’ll finish screwing this off. We’ll get our pieces ripped. We’re going to stagger them the same way we did the floor. So, we’ll be back shortly to show you that. Okay, we’ve gone ahead placed all our plywood on the last run here. We have staggered the plywood just like on the floor. This was a larger roof. You’d want to go 4 ft and then 8 ft. But because of the size of the roof, this is how it works out. It’s one truss difference. Another important thing to know about in between your trusses where your plywood joints together, you should have an eighth of an inch space and use H clips. Reason for that, if you don’t have these
in place here, your plywood can push past the other sheet of plywood. What’ll happen is when your shingles are on here, they’ll crack. So, you got to put these in. They’re really easy. They look like that. Typically come in bags like that. and you just slide them onto the edge of the plywood in the center of your space between your trusses. Next sheet comes in, it just slides into place. Also automatically gives you an eigh inch space. Very handy and definitely will add life to your roof. That’s about it for this side here. Just the same as on the lower sheets. Make sure you’re in a little bit from the ends. Nice and tight to the peak. Once you have this side done,
you can remove your spacing brace on this side and do the other side exactly the same way. Now, also, if you’re using a vented ridge, you’re going to insulate your shed, you may want to cut this back a little bit from the peak, check with the vent for the ridge that you’re buying, the company what their instructions are for that. If you’re not insulating and you’re not putting a uh ridge vent up here, you don’t have to worry about it. Just keep it tight. You don’t need any backing here for the top. The two pieces coming together will be more than strong enough for the ridge on your roof when we do the a [ __ ] shingles. So,
go ahead finish the other side. We’re going to do that. Go ahead and do that and then uh we’ll come back and I’ll show you some detail on how we’re going to do the fascia and why we’re doing the roof first and some of the things that we’re not doing that you might expect we were.
Continue the Shed-Building Series
Follow the lessons in sequence so each completed stage is ready for the work that follows.